Sponsored Ad

Monday, November 2, 2009

Recommended System Testing Process

Feature Articles-

This team interacts directly with the customers. Team gather requirements, group them in to a bundle and a single person in the team may 'own' two or more bundle of feature. They take the initiative, interact with different teams and provide direction, in developing this feature.

Let’s begin by defining the term 'process'. System is nothing but a set a activities that represent the way work is to be performed, basically put it’s a specific way of doing definite thing, in our context it is developing a program product.

The following is the squad structure needed to implement the system

UI Team-

User Interface is important for any product. No matter how plenty of lovely features a product have, if the UI sucks, then the product is doomed. So they have separate UI team, that does a lot of research in UI and knows the difference between a lovely UI and bad two, they specialize in designing UI for any product.

This team will design the UI for our product or features of the product. Feb. will sit with UI team to get the UI for their features. They basically will come up with some sort of 'Page designs' or some mockups'. These mockups contains all the UI elements that should be present in that page, along with the look and feel, the navigation between pages should also be working.

The development team: develops the product

Test team: test team tests the product

Process Step-

The process starts after the performance of owners to develop a high-level design for each document feature. Apart the paper, page layouts or Mock UI reference must be released.

The development team starts coding features, where as test team begins preparing the test cases.

First, before the actual preparation of test cases, it is always better to prepare a scheme outline. A test basically contains multiple test scenarios / high-level flows, including information Red what should be checked / verify at what point of the current.

Apart from the flows, the document may contain a matrix that maps the requirements (HLD can give to every need unique) High-Level Dialogue for the flow test to ensure that all requirements have been thoroughly checked and no redundancy

Second, each test flow / stage becomes a single test must be very case. The detailed. It must specify the exact fairways, accurate and what should be checked. This is especially useful when the writers of cases test are different from executing test case.

Third and optional step is automating these test cases to automation tools.

At the moment the development team just coding features, and optionally do some tests on the other hand, the test team must be ready to test cases (in case of execution manual) or automated scripts ( if test execution with automated tools)

Once you start the test cycle, test equipment and product testing records fixing errors as a team of insect development.

0 comments:

Post a Comment

Sponsored Ad

Development Updates

Tech Updates