A static test is necessary for detection of defects in the design phase and verify precisely the tasks for development of program modules and test plan. Thus, immediate performers of software modules will have a minimal sufficient package, but at the same time documents allowing them to begin working with waste minimal time in the study documents and comprehension tasks. Testers, in turn will have a comprehensive test plan, allowing them to verify the operation of the program product according to a criterion of "how it should work", not "how it was to work", as often happens.

The economic benefits are obvious static tests. Most of the large errors in the products of the program are derived from incomplete lists of demands of the tasks or incorrect. A developer often receive inadequate or excessive package of documents. These difficulties will be solved, using the static test. This means that the possibility of serious errors is dropping in the development phase. According to estimates, the costs of correcting errors in the static testing phase is 5 times less than in dynamic testing phase and 20 times less than in the operation stage of the product program. Our team will offer a series of operations necessary for the static test, ensuring high quality project documents and minimize the possibility of critical errors in the software already done.

The static testing involves contacts with the client or the contractor for the project, i.e. a person, able to express explicitly and the task of correcting the claims, if necessary.

The next job of the requirements for the software product: the client or his representative, the representative of the developer’s team representative team of assessors. At this stage the team of testers to control, to the list of requirements is complete and consistent. In the development stage of the testers of the composition of tasks, together with a leading developer of check, if tasks are full and not excessive.

A test plan for dynamic testing is formed during the static test. In it, including control of all the requirements for software products, and control of checkpoints, defined together with developers, as the choice of endpoints of the test depends on the programming tools significantly.